Search Results for: *:*

Default thumbnail

Rehoboth Chapel (welsh Calvinistic Methodist), Tre Taliesin

7333 ·

The cause in Taliesin was started in 1773 and the Rehoboth School was built in 1791. in 1833 the first chapel was built in the long wall style, and was subsequently rebuilt as the current built in ...

View Record
Default thumbnail

Soar Methodist Church (wesleyan), Tre’r-ddol

7335 ·

The Wesleyan cause in Tre-ddol stared in 1804 and the first Soar Methodist Chapel (NPRN 97034) was built in 1806, rebuilt in 1845 and enlarged in 1864. Soar was finally rebuilt on the current site ...

View Record
Default thumbnail

Coed-y-bryn Chapel (welsh Calvinistic Methodist), Coed-y-bryn

7337 ·

Coed-y-Bryn Methodist Chapel was built in 1866 and rebuilt in 1886. The current chapel is in the Simple Gothic style of the gable entry type. A chapel house was added in 1902.

In 1905 (Royal Commi...

View Record
Default thumbnail

Carmel Chapel (welsh Calvinistic Methodist), Llanilar

7339 ·

The cause in Llanilar started in 1788 and Carmel Methodist Chapel was built in 1796. The chapel was subsequently rebuilt in 1814, 1824 and 1879, This later chapel was designed by the architect Ric...

View Record
Default thumbnail

Maen-y-groes Welsh Independent Chapel, Maen-y-groes

7347 ·

Maen-y-Groes Independent Chapel was built in 1828, due to the fact that many people were mambers of Penrhiwgaled which was some distance away. A piece of land was aquired on Maen-y-Groes, a smallho...

View Record
Default thumbnail

Brynrhiwgaled Welsh Independent Chapel, Pentre’r-bryn

7350 ·

Brynrhiwgaled Independent Chapel and Schoolroom were first built in 1781. The cause was formed after a disgreement in the shared Independant and Baptist chapel at Llwyndafydd chapel became so sever...

View Record
Default thumbnail

Bwlch-llan Chapel (welsh Calvinistic Methodist;penuel), Bwlch-llan

7390 ·

Initial meetings were held in local homes, and the first Schoolhouse was built in 1836. This was pulled down and replaced by the chapel in 1841 on land leased from Dr Morgn of Frongoch. Bwlch-llan ...

View Record
Default thumbnail

Bethel (3) Methodist Chapel (wesleyan), Pontrhydygroes/pont-rhyd-y-groes

7420 ·

Capel Bethel Methodist Chapel was first built in 1810 when it was a small structure with a thatched roof. Part of this, or the second chapel which was built in 1841, may survive in the form of asm...

View Record
Default thumbnail

Capel Enoch (wesleyan Methodist;capel Enock)

12132 ·

The cause started in 1812 and the first chapel was built in 1833. During that time worship had been taking place at the house of a Mr Enoch Jones of Abereinion. He then asked Mr John Lloyd of the A...

View Record