Caio Chapel was first built 1777then rebuilt in 1837 as a long-wall chapel. New Singers Pew in 1875. In 1907 the chapel was remodelled in the Sub-Classical style of the gable-entry type, with a cen...
Pumpsaint Chapel was built in 1875 and enlarged in 1886. The chapel is built in the Sub-Classical style of the gable entry type.
RCAHMW, June 2009.
Saron Chapel was built in 1838 and rebuilt in 1876 in the Sub-Classical style of the gable entry type.
RCAHMW, JUNE 2009.
Capel Hendre was built in 1812, then rebuilt/modified in 1841, 1879 and 1900. The current chapel, dated 1879 is built in the Sub-Classical style of the gable entry type.
RCAHMW, June 2009
Twynllannan Methodist Chapel was built in 1790 and rebuilt in 1827, 1899 and modified in 1910. The present chapel, dated 1899, is built in the Sub-Classical style of the gable entry type.
RCAHMW, ...
Bethania Baptist Chapel was built in 1850, rebuilt in 1869 and modified in 1887. The present building, dated 1869, is built in the Sub-Classical style and with a gable-entry plan
RCAHMW, June 2009...
Moriah Baptist Chapel was built in 1872 to the design of builder John Powell of Llanelli. The chapel is built in the Sub-Classical style of the gable-entry type and is now Grade 2 listed.
RCAHMW, ...
The Plough Chapel, Brecon, formerly the Welsh Congregational Chapel, had one of the earliest independent chapel congregations in mid-Wales, dating back to 1699, and taking its name from the house i...
Watergate English Baptist Church was first built in 1806 and rebuilt in 1833, possibly to the design of Reverend. William Lewis of Aberdare. Further rebuilding took place in 1880, together with a n...
Horeb Chapel was built in 1807 in the Simple Round-Headed style, gable entry type, and rebuilt twice, in 1846 and 1900.
RCAHMW, 19th May 2009.
Recent Comments