Search Results for: *:*

Default thumbnail

Tyddyn Methodist Chapel (wesleyan), Bryncroes, Botwnnog ,

6765 ·

Tyddyn Wesleyan Methodist Chapel was originally built in 1804, but later renovated in 1885. It has since been remodelled and is a domestic dwelling. The chapel is in the Vernacular style, built fro...

View Record
Default thumbnail

Pisgah Welsh Methodist Chapel (wesleyan;rhiwlas), Rhiwlas

6949 ·

Pisgah Methodist Chapel was built in 1832 and then rebuilt/modified in 1863 and 1897, in the Vernacular style of the gable entry type.

RCAHMW, October 2009

View Record
Default thumbnail

Preswylfa Methodist Church (wesleyan), Llandudno Junction

6992 ·

Preswylfa Methodist Chapel was built in 1890 in the Vernacular style of the gable entry type.

RCAHMW, October 2009

In 2000, the chapel schoolroom was converted into a dwelling,
Conwy Planning Off...

View Record
Default thumbnail

Soar Methodist Chapel (wesleyan;glasinfryn), Glasinfryn, Bangor

7089 ·

Soar Methodist Chapel was built in 1836 and rebuilt in 1892 in the Vernacular style of the gable entry type. The chapel was damaged c.1980 and has since fallen into disuse.

RCAHMW, October 2009

View Record
Default thumbnail

Salem Welsh Methodist Chapel (wesleyan;pentre Halkyn), Pentre Halkyn

8026 ·

Salem Methodist Chapel was built in 1840, enlarged in 1845 and 1852, renovated in 1869 and largely rebuilt in 1896. The present chapel, dated 1896, is built in the Vernacular style of the gable-ent...

View Record
Default thumbnail

Ebenezer Welsh Methodist Chapel (wesleyan), Bagillt

8170 ·

Ebenezer Methodist Chapel was built in 1880, to the design of architect Richard Gratton, in the Vernacular style with a long-wall entry plan. Ebenezer closed in 1972.

RCAHMW, January 2009

View Record
Default thumbnail

Carmel Welsh Methodist Church (wesleyan;gwernymynydd), Gwernymynydd

8212 ·

Carmel Methodist Chapel was built in 1828 and enlarged in 1856. The chapel was rebuilt in 1880 in the Vernacular style of the long-wall entry type. By the late twentieth century Carmel had fallen i...

View Record
Default thumbnail

Salem Methodist Chapel (wesleyan;mynyddbach), Mynydd Bach

7312 ·

The cause here started in 1807 and the first Salem Methodist Chapel was built in 1812. The chapel was subsequently rebuilt in 1844 and altered in 1875. The chapel is cement rendered, built in the l...

View Record
Default thumbnail

Horeb Methodist Chapel (wesleyan), Betws-yn-rhos

7490 ·

Horeb Methodist Chapel was built in 1833 and rebuilt in 1895 in the Vernacular style with a gable entry plan. By 1995 Horeb stood disused.

RCAHMW, November 2009

View Record
Default thumbnail

Salem (1) Methodist Chapel (wesleyan), Rhyd-y-foel, Llanddulas

7491 ·

Salem Methodist Chapel was built in 1825, enlarged in 1831 and 1844 and renovated in1868. The chapel was then rebuilt in 1894, to the design of architect Richard Davies of Bangor, in the Vernacula...

View Record