The Welsh Methodist Chapel in Llangynidr was built in 1847 and closed in 1950.
RCAHMW, June 2009
Bethel Chapel was built in 1848 by Cefn Brynych canal lock.
RCAHMW, June 2009.
Capel-y-Ffin Church was converted from a house in 1737 and rebuilt in 1762 in the Vernacular style with a long-wall entry plan.
RCAHMW, June 2009.
Beulah Chapel was built in 1821 as a schoolroom and then converted/rebuilt in 1841. A second rebuild took place in 1883 to the design of architect John Humphreys, built in the Simple Round-Headed...
Tabernacle Chapel was built in 1811, and rebuilt in 1841 and again in 1893. The latest chapel is Simple Gothic in style and has a gable entry plan.
RCAHMW, June 2009.
Lanwrtyd Chapel was built in 1867 by the prolific Welsh architect, Reverend Thomas Thomas of Landore, Swansea. It is built in the Simple Gothic style with a gable-entry plan.
RCAHMW, June 2009.
Gelynos Chapel was first built pre-1800 and rebuilt in 1837. By 2000 the chapel had been demolished.
RCAHMW, June 2009.
The Zion English Church was formed and built in 1863.
RCAHMW, June 2009
The original Bethesda Chapel at Llanwrtyd Wells was built in 1808, then rebuilt in 1867 to the design of Thomas Thomas of Landore.The chapel was enlarged/rebuilt again in 1907 to the design of the ...
Penuel Chapel was built in 1832 and altered in 1890 in the Vernacular style with a long-wall entry plan.
RCAHMW, June 2009.
Recent Comments