The church appears to have been built in the later C20 based on architectural evidence. Status (2002): Chapel
The church appears to have been built in the late C20th based on architectural evidence, long-wall entry type. Status (2002): Chapel
The date table implies that the Chapel was built after 1945. Status (2000): unknown
Built in 1934, architect S.C.Foulkes of Colwyn Bay. Present status 2011: chapel
The Chapel is now demolished. Present status [2000]: demolished
Built in 1929 in the Sub-Classical and Arts and Craft style, gable entry type. Present status [2002] : unknown
Built in 1936. Built in the Simple Round-Headed style, gable entry type. Present status [2002] : unknown
Built in the Late 20th c style, gable entry type. Present status [2003] : unknown
The present church dates from 1890 and stands opposite the original chapel of 1851 (NPRN: 9648); it is built to the design of J Emmanuel of Llanishen (Jonathan Pritchard).
Recent Comments